Storm Sewer Installation and Roadway Widening Works
This project involved the upgrading of an existing roadway through the installation of approximately 720 meters of storm sewer infrastructure, including new catch basins and associated drainage works to improve long-term surface water management within the area.
The scope also included the construction of new concrete curb and sidewalk, asphalt reinstatement, residential driveway tie-ins, and landscaping restoration to integrate the improvements seamlessly into the surrounding neighbourhood.